Saturday 18 August 2018

Letter for Tenant Access Approval Noori Town


Date  :         02nd January, 2011

Ref.    :         xxxxxxxxxxx
      
M/s. xxxxxxxx
P. O. Box: xxxxxx
xxxxxx
Plot No. xxxxxx
Tel: xxxxxx Fax: xxxxxxxxx

Attn.           :         Mr. xxxxxxx – Construction Director  

Project        :         xxxxxxxxxxx

Location     :         xxxxxxxxxxx

Subject       :         Tenant Access Approval Noori Town

Dear Sir,

Reference is made to the above mentioned subject and further to your letter dated 28th December, 2010 along with proposed protection drawings; we have no objection to your proposal for the protection of existing collector line adjacent to your plot entrances (slab at a depth of 750mm from the surface level to avoid any caving of the soil below the road) and further follow the standard protection to the rest of the existing services incompliance with M/s. ZonesCorp Site rules and regulation.

Please note that you are fully responsible for the aforementioned works in case of any damages that might occur. All your works will be under our (xxxxx) supervision and all excavations to be executed manually.

For any further details/clarifications and before commencing your activity at site please coordinate with our representatives (xxxxxxxxxxxx).

This is forwarded for your information and further action.

Thanks and best regards,
For XXXXXXXXXX


xxxxxxxxx
Facility Manager

Encl: As Stated Above
Cc:  M/s. xxxxxxxxxxxxxxx
        
        

Letter for Conservancy Violation (Housekeeping)


Date  :         27th February, 2011

Ref.    :         xxxxxxx
      
M/s. xxxxxx 
P. O. Box: xxxxx
xxxxxxxx
Tel: xxxxxxxx Fax: xxxxxx

Attn.           :         Mr. xxxxxxxx

Project        :         xxxxxxxxxxxxx

Location     :         xxxxxxxxxxxx

Subject       :         Conservancy Violation (Housekeeping)

Dear Sir,

Reference is made to the above mentioned subject and to our (xxxx) continuous site inspections (Photos captured), we have spotted a conservancy violation on your plot by your suppliers/workers which is totally prohibited according to M/s. xxxxx site rules & regulations.
Therefore, under the authority provided to us by xxxxxxxxx; you are herby requested to take action to clean the area immediately and maintain Housekeeping for image of the city.
Please be instructed to your co-workers to stop such type of violations and follow the site rules & regulations hoping that such violations will not be repeated


This is forwarded for your consideration and immediate action.

Thanks & best regards,
For XXXXXXXXXXXXXXX


xxxxxxxx
Facility Manager
Encl: As Stated Above
Cc:           M/s. xxxxxxxxxxxxxx 

Letter for Telephone Cable Connection Works Babli


Date  :         02nd March, 2011

Ref.    :         ddddd
      
M/s. Xxxxxxxxx
xxxxxxx

Attn.           :         xxxxxxx - General Manager  

Project        :         xxxxxxxxx

Location     :         xxxxxxx

Subject       :         Telephone Cable Connection Works Babli

Dear Sir,

Reference is made to the above mentioned subject and further to your letter dated 02nd March, 2011 concerning the same, we have no objection to proceed with your activity (Telephone Cable Connection to the Plot No. Babli) incompliance with M/s. LWA rules & regulations.

Please note that you are fully responsible for the aforementioned works in case of any damages that might occur. All your works will be under our (xxxxx) supervision and all excavations to be executed manually.

For any further details/clarifications and prior commencing your activity at site please coordinate with our representatives (xxxxxxxx).

For any further details/clarifications please do not hesitate to contact with us.

This is forwarded for your consideration and action.

Thanks and best regards,
For xxxxxxxxxxxxxxxxxxxx

xxxxxxxxxxxxx
Facility Manager
Encl: As Stated Above
Cc:   M/s.Babli Town                

Sunday 29 April 2018

VIOLATION (Site Rules & Regulations) Cleanliness Issue



Date  :         Wednesday, 08th January, 2014

Ref.    :         ccr/%$/5      

M/s. Bakra Sdd
P. O. Box: 2103 Lahore- Pakistan
Tel: 042- 6220277 Fax: 042- 6220274

Attn.           :         General Manager

Project        :         Your Project Name

Location     :         Model Town Lahore

Subject       :         VIOLATION (Site Rules & Regulations) Cleanliness Issue

Dear Sir,

Reference is made to the above mentioned subject and further to Your Company Name Enforcement continuous site inspections, with regards to the cleanliness issue that has been spotted adjacent road Kalo  (Nirala Sweets) as shown the attached pictures done by your vehicles which is totally prohibited and against to M/s. LMC rules and regulations under the ‘Tenant Handbook’ Definitions, Passage No. 8 (8:1) i.e “all vehicles must be cleaned before leaving the site and applicant shall maintain the cleanliness of the entire carriage way”.

Therefore, under the authority provided to us by LMC; you are herby STRICTLY INSTRUCTED to take immediate action to clean the road and reinstate the carriageway to its pervious status, and keep/maintain required supervision to ensure that the works conducted on your plot do not harmfully affect to M/s. LMC and others property/assets and to keep up the city image to the satisfaction of M/s. LMC.

Moreover, you are hereby kindly advised to Apply for Temporary Access/Entrance Application (Application Forms attached) in order to provide a proper access road temporarily to your plot (Nirala Seweets) in which we believe that this is the only corrective procedure that to be taken to guarantee non repeatable of similar violation.

Your Company name await your full cooperation in regards to the site activities, failure to do so, will force us to elevate this matter to M/s. LMC Legal Department to take and enforce the necessary corrective procedures against you.

For any further details/clarifications, please do not hesitate to contact with Your Company Name Enforcement Team -Tel: 042-5073502/042-5512345.

This is forwarded for your consideration and immediate action.

Thanks and best regards,
For Your Company Name


Eng. Kamran Khan
Area Incharge
Encl: As Stated Above
Cc: M/s. LMC Lahore


VIOLATION (Site Rules & Regulations) Cleanliness Issue



Date  :         Wednesday, 08th January, 2014

Ref.    :         xxxxxxxxxxxxxxxxxxx      

M/s. xyaz
P. O. Box: 2103 Lahore, Pakistan
Tel: 042- 6220277 Fax: 042- 6xxxxd

Attn.           :         General Manager

Project        :         Your Project Name

Location     :         Model Town Lahore

Subject       :         VIOLATION (Site Rules & Regulations) Cleanliness Issue

Dear Sir,

Reference is made to the above mentioned subject and further to Your Company Name Enforcement continuous site inspections, with regards to the cleanliness issue that has been spotted adjacent road Shaheed Line , Front of Bakkers Sweets as shown the attached pictures done by your vehicles which is totally prohibited and against to M/s. LMC rules and regulations under the ‘Tenant Handbook’ Definitions, Passage No. 8 (8:1) i.e “all vehicles must be cleaned before leaving the site and applicant shall maintain the cleanliness of the entire carriage way”.

Therefore, under the authority provided to us by M/s. LMC; you are herby STRICTLY INSTRUCTED to take immediate action to clean the road and reinstate the carriageway to its pervious status, and keep/maintain required supervision to ensure that the works conducted on your plot do not harmfully affect to M/s. LMC and others property/assets and to keep up the city image to the satisfaction of M/s. LMC.

Moreover, you are hereby kindly advised to Apply for Temporary Access/Entrance Application (Application Forms attached) in order to provide a proper access road temporarily to your plot (Bakkers Sweets) in which we believe that this is the only corrective procedure that to be taken to guarantee non repeatable of similar violation.

Your Company Name await your full cooperation in regards to the site activities, failure to do so, will force us to elevate this matter to M/s. LMC Legal Department to take and enforce the necessary corrective procedures against you.

For any further details/clarifications, please do not hesitate to contact with Your Company Name Enforcement Team -Tel: 042-5073502/042-5512345.

This is forwarded for your consideration and immediate action.

Thanks and best regards,
For Your Company Name


Kamran Khan
Area Manager
Encl: As Stated Above
Cc: M/s. LMC Lahore                                                                                            


Saturday 7 April 2018

Violation - Non Compliance with Sewer Discharge Rules


Date  :         Wednesday, 08th January, 2014

Ref.    :         TTR/34/TER/4

M/s. Peenat Cont.
P. O. Box: 32020 Multan, Pakistan
Tel: 085-8651245 Fax: 085-5985887

Attn.           :         General Manager

Project        :         Your Project Name

Location     :         Multan Town

Subject       :         Non Compliance with Sewer Discharge Rules     

Dear Sir,

Reference is made to the above mentioned subject and further to M/s. Mutlan Town verbal instructions and to the attached e-mail dated 02nd January, 2014 and to TRUC Laboratory Analysis Report Ref. No. 1014-13 dated 16th December, 2013 based on the Agreement with Multan Municipality Cor. for the monitoring and enforcement of Tenant discharge operations along with the Authorized Multan Municipality Cor Laboratory Analysis Sample Report collected from your chamber/manhole at storage Area in which clearly stated that the COD (Chemical Oxygen Demand) and BOD (Biochemical Oxygen Demand) values are exceeding the maximum limits which will not be acceptable according to the M/s. Multan Town and MTC Tenant Discharge Control rules and regulation clause 4.2 & 4.3 (RSB).

Therefore, you are hereby strictly instructed to respect, obey and follow the RSB sewer rules and trade effluent control regulations as provided by M/s. Multan Town for safe and efficient sewerage/waste water services to MMC Tenants/customers and to the satisfaction of M/s. MMC. Moreover, you are hereby instructed to research and investigate the reason of such violation and immediately go through proper solution under your own cost.

Please note that Your Company Name will investigate the MMC sewer network and if find any violations, we will raise the issue to M/s. MMC and Incident report will be issued to the concerned authority for further necessary action and you will be penalized/charged.

You are hereby requested and required to coordinate with M/s. MMC - Tel: 052-5500000 for further assistance in order to resolve the aforesaid issues at the earliest. 

This is forwarded for your consideration and immediate action.

Thanks and best regards,
For Your Company Name


Allah Daad
Co. Inc
Encl: As Stated Above
Cc:  M/s. Multan Town
                MMC Multan          

Wednesday 4 April 2018

VIOLATION-Illegal Store-Pile Excavated Materials-Soil


 Date  :         Monday, 06th January, 2014

Ref.    :         TRKD/458/487/7      

M/s. Creem Cont.
P. O. Box: 55402 Fareed Town
Tel: 051-58452 Fax: 051-5932

Attn.           :         General Manager

Project        :         Your Project Name

Location     :         Fareed Town Rawalpindi

Subject       :         VIOLATION/Illegal Store/Pile Excavated Materials/Soil

Dear Sir,

Reference is made to the above mentioned subject and further to your company name continuous site inspections, we have spotted a violation that you have stored/piled excess materials and soil  illegally to the adjacent Plot Al Bila House at Fareed Town as shown the attached photographs without prior Notifications or any Approval from concerned Departments/Authorities which is totally prohibited and utterly against to M/s. Fareed Town rules and regulations, and the legal consequences shall apply and penalized for the same.

Therefore, under the authority provided to us by The Higher Corporation for Fareed Town; YOU ARE HEREBY STRICTLY INSTRUCTED TO STOP ALL YOUR SITE ACTIVITIES, and immediately coordinate with M/s. Fareed Town for further assistance in order to solve the aforesaid issue. You are fully responsible in case of any damages might be occurred to the existing underground utilities and road furniture.

Please advise your site representatives/Engineers to respect, obey and follow Your Company Name Procedures and M/s. Fareed Town site rules and regulations, we hope that this kind of act WILL NOT BE REPEATED.

Moreover, please note that the Tenants SHOULD NOT be permitted to encroach or to dump/stock any materials outside of your permitted plot limit or in the service corridor area unless you have permit from M/s. Fareed Town.  (Service corridor area should be cleared from any construction stuff incompliance to M/s. Fareed Town site rules & regulations).

We await your full cooperation to resolve the aforesaid, failure to do so will force us to elevate this matter to M/s. Fareed Town Legal Department to take and enforce the necessary corrective procedures through Security officers (M/s. Al Fateh Security) whom are representing M/s. Fareed Town HSE Department.



For any further details/clarifications, please do not hesitate to contact with your company name Enforcement Team -Tel: 051-5853545

This is forwarded for your consideration and immediate action.

Thanks and best regards,
For your company name


Eng. Tahir Khan
Area Manager
Encl: As Stated Above
Cc: M/s. Fareed Town Management                                                                                                       
M/s. Al Fateh-Security                                                          


Monday 2 April 2018

Temporary Access at Lala Zar House


Date  :         Monday, 06th January, 2014

Ref.    :         cdczxzx

M/s. 3D Contrating  
P. O. Box: 51471 Abu Dhabi, UAE
Tel: 051-56895 Fax: 051-58972

Attn.           :         General Manger

Project        :         Your Project Name

Location     :         Scheme 3 - Islamabad

Subject       :         Temporary Access at Lala Zar House

Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. (NILL) received 06th January, 2013 concerning the same, please be informed that Your Company Name has no objection to proceed with your site activities, Temporary Access/Entrance at site according to the attached drawing Ref. No. TREF/AS-1 incompliance with M/s. RMC rules and regulations on a condition, based to maintaining and protecting the existing utility services and further to reinstate the site as previous status once you finished/completed your works and we recommend use/apply the permanent road access/ entrance for the same.

Please note that you CANNOT USE any equipments/mechanical excavation over the service corridor, and further you are fully responsible for the aforementioned activities in case of any damages might occur to M/s. RMC assets and all the works will be under our (Your Company Name) Supervision.

This NOC/Clearance is only for temporary access/entrance to be applied upon completion of the above to enable you to proceed with internal activities inside Plot and Your Company Name has the authority to cancel/withdraw the permit once we notify any violation at Site.

Moreover, you are required to apply the Temporary Fence and Project Signboard Permit directly to M/s. Lalazar Management – ESD and further issue the copy of Approval for the same to us prior commencement of Temporary Access/Entrance works at site.

Prior site commencement of works, you are required to coordinate with Your Company Name Team Tel: 042-5512345/042-5073502 for further details/clarifications and assistance.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Mrs. Huda Malik
Client Manager
Encl: As Stated Above                                                                                            
Cc: M/s. Lala Zar Management                                                                                                         

Temporary Access at Sector 3A


Date  :         Monday, 06th January, 2014

Ref.    :         xxxxxxxxxxxxxxxx

M/s. Zima Steel  
P. O. Box: 78596 Lahore, Pakistan
Tel: 042- 5550975 Fax: 042- 5550974

Attn.           :         General Manger

Project        :         Your Project Name

Location     :         Lahore

Subject       :         Temporary Access at Sector 3A

Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. LO13050_Z1336 dated 25th December, 2013 concerning the same, please be informed that Your company name have no objection to proceed with your Temporary Access/Entrance only at site according to the attached drawing Ref. No. TRF/T/AS-1 incompliance with M/s. Bahria Town rules and regulations on a condition, based to maintaining and protecting the existing utility services and further to reinstate the site as previous status once you finished/completed your works and we recommend use/apply the permanent road access/ entrance for the same.

Please note that you CANNOT USE any equipments/mechanical excavation over the service corridor, and further you are fully responsible for the aforementioned activities in case of any damages might occur to M/s. Bharia Town assets and all the works will be under our (Your company name) Supervision.

This NOC/Clearance is only for temporary access/entrance to be applied upon completion of the above to enable you to proceed with internal activities inside Plot and Your company name has the authority to cancel/withdraw the permit once we notify any violation at Site.

However, Temporary Fence and Project Signboard Permit/Approval to be applied and to obtain directly from M/s. Bharia Town – ESD and further issue the same to us prior commence Temporary Access/Entrance works at site.

Prior site commencement of works, you are required to coordinate with Your company name Team Tel: 042-455512345/042-57893502 for further details/clarifications and assistance.

This is forwarded for your consideration and further action.

Thanks and best regards,
For your company name


Eng. Noman Malik
Area Manager
Encl: As Stated Above                                                                                            
Cc: M/s. Bharia Town Management                                                                                                     


Sewer Network Connection – Model Town - Area


 Date  :         Sunday, 05th January, 2014

Ref.    :         xxxxxxxxxxxxxxxxx
      
M/s. Sub-Contractor Name.
P. O. Box: xxxx Lahore, Pakistan
Tel: 042-0052 Fax: xxxxx

Attn.           :         General Manager

Project        :         Your Project Name

Location     :         Model Town - Lahore

Subject       :         Sewer Network Connection – Model Town - Area

Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. FIBCONT/PPM003/13841/2013-EA dated 03rd January, 2014 along with signed Applications and drawing concerning the same, please be informed that Your Company Name have reviewed your submittal and No Objection to proceed with your drainage connection works at site according to the submitted drawings and LMC standards incompliance with M/s. Model Town rules and regulations.

However, you CANNOT DISCHARGE to the system till you get final approval from the Model Town Management and all your excavations to be executed manually (only Manual excavations allowed at service Corridor).

Please find attached herewith the RSB -Tenant Discharge Control Rules (CD-Soft copy) for your review, respect, obey and follow the RSB sewer rules and trade effluent control regulations as provided by M/s. Model Town for safe and efficient sewerage/waste water services to Model Town Area Tenants/customers and to the satisfaction of M/s. Model Town Management.

Note: Commencement and completion of your sewer connection works must be within two (2) months from the date of issuance this approval and a set of As Built drawing (Hard + Soft copies) to be provided to Your Company Name upon completion and certification request for Clearance.

In addition to the above, you are required to coordinate with Your Company Name Team Tel: 042-dddd/042-5894502 for further clarifications/details prior proceed your activities.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Eng. MollaH Mian
Area Incharge
Encl: As Stated Above                                                                                            
Cc: M/s. Model Town Management
      M/s. LMC


VIOLATION (Site Rules & Regulations) Cleanliness Issue



Date  :         Sunday, 05th January, 2014

Ref.    :         xxxxxxxxxxxxxxxx
      
M/s. Company Name
P. O. Box: xxxxxxx, Multan Road Lahore
Tel: xxxxxxxxxxx Fax: xxxxxxxxxxx

Attn.           :         General Manager

Project        :         Multan Road Lahore

Location     :         Lahore Pakistan

Subject       :         VIOLATION (Site Rules & Regulations) Cleanliness Issue

Dear Sir,

Reference is made to the above mentioned subject and further to Your Company Name Enforcement continuous site inspections, with regards to the cleanliness issue that has been spotted adjacent road Link Road (Plot frontage) as shown the attached pictures done by your vehicles which is totally prohibited and against to M/s. LMC rules and regulations under the ‘Tenant Handbook’ Definitions, Passage No. 8 (8:1) i.e “all vehicles must be cleaned before leaving the site and applicant shall maintain the cleanliness of the entire carriage way”.

Therefore, under the authority provided to us by The LMC; you are herby STRICTLY INSTRUCTED to take immediate action to clean the road and reinstate the carriageway to its pervious status, and keep/maintain required supervision to ensure that the works conducted on your plot do not harmfully affect to M/s. LMC and others property/assets and to keep up the city image to the satisfaction of M/s. LMC.

Your Company Name await your full cooperation in regards to the site activities, failure to do so, will force us to elevate this matter to M/s. LMC Legal Department to take and enforce the necessary corrective procedures against you.

For any further details/clarifications, please do not hesitate to contact with Your Company Name Enforcement Team -Tel: xxxxxxxxx.

This is forwarded for your consideration and immediate action.

Thanks and best regards,
For Your Company Name

Eng. Malik Khalid Khan
Area Incharge
Encl: As Stated Above
Cc: M/s. Lahore Municipal Corporation


REPEATED VIOLATIONS & DESTRUCTION (Damages to PTCL Cable Pipeline at Road)


Date  :         Sunday, 05th January, 2014

Ref.    :         xxxxxxxxxxxxxx

M/s. xxxxxxxxxxxxxx
P.O. Box: xxxxxxxxxxxxxxxx
Tel xxxxxxxxx Fax: xxxxxx

Attn.           :         Mr. Sajeem Khan – Project Manager

Project        :         xxxxxxxxxxxxxxxxx

Location     :         New Town

Subject       :         REPEATED VIOLATIONS & DESTRUCTION
(Damages to PTCL Cable Pipeline at Road)
Dear Sir,

We refer to our meeting held on Monday, 02nd September, 2013 at Your company name Site Offices in presence of yourself, your safety officer along with your company name Management and Safety officer in which you promised to fulfill all safety measures during your site activities.

Further to our/your company name Team continuous site inspections (Photos captured), we have your company name have spotted damages to PTCL communication cable pipes (4 pipelines) as showing in the attached photos resulted by your mechanical excavation operations adjacent to the road Hattar Industrial City and you are fully responsible for the damages occurred.

Under the authority provided to us by New Town Management; you are herby strictly instructed to coordinate with PTCL Contractor /Technician to inspect/check and to do the necessary corrective procedures to reinstate the damaged PTCL pipe to its operational status under the supervision of your company name Team. NO BACKFILL is allowed until trenches are inspected by your company name Team along with Clearance /NOC from PTCL Telecommunication Department Pakistan.

Hopping this act will not to be repeated and pay more attention to M/s. New Town services.

We await your full cooperation, failure to do so will force us to elevate this matter to M/s. New Town HSE Department and their Security Office for them to take and enforce the necessary corrective procedures against you.

This is forwarded for your consideration and immediate action.

Thanks & best regards,
For Your Company Name


Eng. Kamran Aziz Khan
Area Inchrage
Encl: As Stated Above
Cc: M/s. New Town Management

Wednesday 28 March 2018

REPEATED VIOLATIONS & DESTRUCTION (Damages to Etisalat Cable Pipeline at Road)


Date  :         Sunday, 05th January, 2014

Ref.    :         xxxxxxxxx

M/s. xxxxxxxxxxxxxx
P.O. Box: 25224, xxxxxxx
Tel xxxxxxxx Fax: xxxxxxxx

Attn.           :         Mr. Tori Khan – Project Manager

Project        :         xxxxxxxxxxxx

Location     :         Kareem Abad

Subject       :         REPEATED VIOLATIONS & DESTRUCTION
(Damages to ptcl Cable Pipeline at Road)
Dear Sir,

We refer to our meeting held on Monday, 02nd September, 2013 at Your Company Name  Site Offices in presence of yourself, your safety officer along with Your Company Name Management and Safety officer in which you promised to fulfill all safety measures during your site activities.

Further to our/Your Company Name Team continuous site inspections (Photos captured), we have Your Company Name have spotted damages to PTCL communication cable pipes (4 pipelines) as showing in the attached photos resulted by your mechanical excavation operations adjacent to the road  at Kareem Abad and you are fully responsible for the damages occurred.

Under the authority provided to us by The Kareem Abad Management; you are herby strictly instructed to coordinate with PTCL Contractor /Technician to inspect/check and to do the necessary corrective procedures to reinstate the damaged Etisalat pipe to its operational status under the supervision of AJC HFM Team. NO BACKFILL is allowed until trenches are inspected by Your Company Name  Team along with Clearance /NOC from PTCL Telecommunication Lahore.

Hopping this act will not to be repeated and pay more attention to M/s. Kareem Abad services.

We await your full cooperation, failure to do so will force us to elevate this matter to M/s. Kareem Abad HSE Department and their Security Office for them to take and enforce the necessary corrective procedures against you.

This is forwarded for your consideration and immediate action.

Thanks & best regards,
For Your Company Name


Eng. Moosa Khan Durrani
Area Manager
Encl: As Stated Above
Cc: M/s. Kareem Abad Management

TRAFFIC VIOLATION – Ober Mini Driver Noncompliance of Traffic Rules and Regulations


Date  :         Saturday, 04th January, 2014

Ref.    :         xxxxxxxxxx

M/s. xxxxxxxxxx  
P.O. Box: xxxxxxx
Tel xxxxxxx Fax: xxxxxxx

Attn.           :         General Manager

Project        :         xxxxxxxxxxx

Location     :         Kareem Abad

Subject       :         TRAFFIC VIOLATION – Ober Mini Driver
Noncompliance of Traffic Rules and Regulations
Dear Sir,

Reference is made to the above mentioned subject and to the attached Incident Report Ref. No. 166 dated 02nd January, 2014 and further to Your Company Name continuous site inspections, we have spotted a Traffic violations done by your heavy vehicle driving/crossing over the interlock in median and drive opposite road direction as a short cut through going out of your plot/site as showing the attached photographs which this act is very risky/ dangerous, and totally prohibited and against to the Lahore Traffic Police rules and regulations.

Therefore, under the authority provided by The Kareem Abad Management you are hereby STRICTLY INSTRUCTED to do the necessary rectification and reinstate the damaged curbstones and to take corrective procedures and make sure that all your drivers are following /obeying /respecting the traffic rules and regulations at Lahore State, and to take immediate action to clean the area and reinstate the carriageway to its pervious status to the satisfaction of M/s. Kareem Abad Management.

We never encourage/allow violating the rules. Hoping that such type of act WILL NOT BE REPEATED in order to avoid and prevent any unexpected accident that may result human injury.

We await your full cooperation, failure to do so will force us to elevate this matter to M/s. Kareem Abad Management and their Security Office for them to take and enforce the necessary corrective procedures which will not be less than preventing to enter the site again.

PLEASE CONSIDER THIS AS A FINAL WARNING.

This is forwarded for your information and immediate action.

Thanks and best regards,
For Your Company Name


Eng. Hakeem Khan
Area Incharge
Encl: As Stated Above                                                                                                  