Date : DD/MM/YYYY
Ref. : XXXXXXXXXXXXXXXX
M/s. Sub Contractor Name
P.O. Box: xxxxx,
Islamabad - Pakistan
Tel xxxxxxxxxx
Fax: xxxxxxxxx
Attn. : Area Manager
Project : YOUR
PROJECT NAME
Location
: Rawal
Lake – Islamabad - Pakistan
Subject : Tenant
Access/Entrance Approval
For Rawal
Lake - Islamabad
Dear Sir,
Reference is made to the above
mentioned subject and further to your letter Ref. No. (NIL)
dated
22nd December, 2014 along with the signed Tenant Access Application Form, related documents and required drawings concerning the same, please be informed that YOUR COMPANY NAME have no objection to proceed with your activities at site as per the submitted drawings and comments as mentioned in Approval Form (i.e. The existing storm water inlet (IN/97/01/05) to be adjusted to the road level with heavy duty cover, Sewer Manhole close to Access line to be protected and avoided as per attached and Trash bin location to be provided) in compliance with M/s. CDA Islamabad Site rules and regulation.
22nd December, 2014 along with the signed Tenant Access Application Form, related documents and required drawings concerning the same, please be informed that YOUR COMPANY NAME have no objection to proceed with your activities at site as per the submitted drawings and comments as mentioned in Approval Form (i.e. The existing storm water inlet (IN/97/01/05) to be adjusted to the road level with heavy duty cover, Sewer Manhole close to Access line to be protected and avoided as per attached and Trash bin location to be provided) in compliance with M/s. CDA Islamabad Site rules and regulation.
We hereby attach the shop drawing
Ref. No. CDA/TMA/Rawal/lakes/PLOTS-273 & 274
for the existing service protections and required future ducts at your entrance
for your easy reference.
Please note that you are fully
responsible for the aforementioned works in case of any damages that might
occur. All works will be under our supervision and all excavations to be executed manually.
Note: Commencement and completion of your Access Plot
works must be within two (2) months
from the date of issuance this approval and a set of As Built drawing (Hard +
Soft copies) to be provided to YOUR COMPANY NAME upon completion and
certification request for Clearance (NOC).
For any further
details/clarifications and prior commencing your activity at site please
coordinate with us (Tel: xxxxxxx Mobile: xxxxxxxx).
This is forwarded for your
consideration and further action.
For
YOUR COMPANY NAME
Basharat Khan
Construction Manager
Encl:
As Stated Above
Cc:
Head Office – Engineering Dept