Wednesday, 28 March 2018

REPEATED VIOLATIONS & DESTRUCTION (Damages to Etisalat Cable Pipeline at Road)


Date  :         Sunday, 05th January, 2014

Ref.    :         xxxxxxxxx

M/s. xxxxxxxxxxxxxx
P.O. Box: 25224, xxxxxxx
Tel xxxxxxxx Fax: xxxxxxxx

Attn.           :         Mr. Tori Khan – Project Manager

Project        :         xxxxxxxxxxxx

Location     :         Kareem Abad

Subject       :         REPEATED VIOLATIONS & DESTRUCTION
(Damages to ptcl Cable Pipeline at Road)
Dear Sir,

We refer to our meeting held on Monday, 02nd September, 2013 at Your Company Name  Site Offices in presence of yourself, your safety officer along with Your Company Name Management and Safety officer in which you promised to fulfill all safety measures during your site activities.

Further to our/Your Company Name Team continuous site inspections (Photos captured), we have Your Company Name have spotted damages to PTCL communication cable pipes (4 pipelines) as showing in the attached photos resulted by your mechanical excavation operations adjacent to the road  at Kareem Abad and you are fully responsible for the damages occurred.

Under the authority provided to us by The Kareem Abad Management; you are herby strictly instructed to coordinate with PTCL Contractor /Technician to inspect/check and to do the necessary corrective procedures to reinstate the damaged Etisalat pipe to its operational status under the supervision of AJC HFM Team. NO BACKFILL is allowed until trenches are inspected by Your Company Name  Team along with Clearance /NOC from PTCL Telecommunication Lahore.

Hopping this act will not to be repeated and pay more attention to M/s. Kareem Abad services.

We await your full cooperation, failure to do so will force us to elevate this matter to M/s. Kareem Abad HSE Department and their Security Office for them to take and enforce the necessary corrective procedures against you.

This is forwarded for your consideration and immediate action.

Thanks & best regards,
For Your Company Name


Eng. Moosa Khan Durrani
Area Manager
Encl: As Stated Above
Cc: M/s. Kareem Abad Management

TRAFFIC VIOLATION – Ober Mini Driver Noncompliance of Traffic Rules and Regulations


Date  :         Saturday, 04th January, 2014

Ref.    :         xxxxxxxxxx

M/s. xxxxxxxxxx  
P.O. Box: xxxxxxx
Tel xxxxxxx Fax: xxxxxxx

Attn.           :         General Manager

Project        :         xxxxxxxxxxx

Location     :         Kareem Abad

Subject       :         TRAFFIC VIOLATION – Ober Mini Driver
Noncompliance of Traffic Rules and Regulations
Dear Sir,

Reference is made to the above mentioned subject and to the attached Incident Report Ref. No. 166 dated 02nd January, 2014 and further to Your Company Name continuous site inspections, we have spotted a Traffic violations done by your heavy vehicle driving/crossing over the interlock in median and drive opposite road direction as a short cut through going out of your plot/site as showing the attached photographs which this act is very risky/ dangerous, and totally prohibited and against to the Lahore Traffic Police rules and regulations.

Therefore, under the authority provided by The Kareem Abad Management you are hereby STRICTLY INSTRUCTED to do the necessary rectification and reinstate the damaged curbstones and to take corrective procedures and make sure that all your drivers are following /obeying /respecting the traffic rules and regulations at Lahore State, and to take immediate action to clean the area and reinstate the carriageway to its pervious status to the satisfaction of M/s. Kareem Abad Management.

We never encourage/allow violating the rules. Hoping that such type of act WILL NOT BE REPEATED in order to avoid and prevent any unexpected accident that may result human injury.

We await your full cooperation, failure to do so will force us to elevate this matter to M/s. Kareem Abad Management and their Security Office for them to take and enforce the necessary corrective procedures which will not be less than preventing to enter the site again.

PLEASE CONSIDER THIS AS A FINAL WARNING.

This is forwarded for your information and immediate action.

Thanks and best regards,
For Your Company Name


Eng. Hakeem Khan
Area Incharge
Encl: As Stated Above                                                                                                  
Cc: M/s. Kareem Abad Management
    

Drainage Service Connection Points – Kareem Abad


Date  :         Saturday, 04th January, 2014

Ref.    :         xxxxxxxx

M/s. xxxxxxx
P.O. Box: xxxxx
Tel xxxxxFax: xxxx

Attn.           :         Project Manager

Project        :         xxxxxxx

Location     :         Kareem Abad

Subject       :         Drainage Service Connection Points – Kareem Abad

Dear Sir,

Reference is made to the above mentioned subject and further to your request via letter Ref. No. TA-013/P71/02 dated 24th December, 2013 concerning the same, please find attached herewith the drawing (hard + soft copies) Ref. No. CFV/SW/69SR42-00 depicting the existing drainage service connection point’s details allocated adjacent to the plot Kareem Abad as you have requested via aforesaid letter.

Kindly be informed that this drawing is NOT considered to allow you to proceed with any kind of works on site unless you contact Your Company Name  for rules and proper procedures.

For further clarifications/details do not hesitate to contact with Your Company Name Team (Tel: xxxxx/xxxxxx Fax: xxxxxxxx).

This is forwarded for your consideration and action.

Thanks and best regards,
For Your Company Name


Eng. Khashif Ali
Project Incharge
Encl: As Stated Above
Cc: M/s. Kareem Abad Management


VIOLATIONS & DESTRUCTION Damages to PTCL Cable Pipe at Road


Date  :         Thursday, 02nd January, 2014

Ref.    :         XXXXXXXXXXXXXXXXX

M/s. XXXXXXXx
P.O. Box: XXXXXXXx
Tel xxxxxx Fax: XXXXXX

Attn.           :         Mr. saleem Khan – Project Manager

Project        :         xxxxxxx

Location     :         Model Town

Subject       :         VIOLATIONS & DESTRUCTION
Damages to PTCL Cable Pipe at Road  
Dear Sir,

We refer to our meeting held on Monday, 02nd September, 2013 at Your Company Name Site Offices in presence of yourself, your safety officer along with Your Company Name  Management and Safety officer in which you promised to fulfill all safety measures during your site activities.

Further to Your Company Name Team continuous site inspections concerning the same (pictures captured), Your Company Name have spotted damages to the PTCL communication cable pipes (two/2 pipes) as showing in the attached photos resulted by your mechanical excavation operations adjacent to the road  at Model Town and you are fully responsible for the damages occurred.

Under the authority provided to us by The Model Town; you are herby strictly instructed to coordinate with PTCL Contractor /Technician to inspect/check and to do the necessary corrective procedures to reinstate the damaged Etisalat pipes (2 pipes) to its operational status under the supervision of AJC HFM Team. NO BACKFILL is allowed until trenches are inspected by Your Company Name  Team along with Clearance /NOC from PTCL Telecommunication Department Lahore. Hopping this act will not to be repeated and pay more attention to M/s. Model Town services/Assets.

Failure to do so, we will be forced to elevate this matter to M/s. Model Town to take and enforce the corrective necessary legal actions against you, and your required NOC/Clearance will hold until/unless you rectify the aforesaid damages.

This is forwarded for your consideration and immediate action.

Thanks & best regards,
For Your Company Name


Eng. Kamaran Aziz
Technical Manager
Encl: As Stated Above
Cc: M/s. Model Town Management


Saturday, 24 March 2018

Completion Certificate for Sewerage Connection- Navy Gate


Date  :         Saturday, 04th January, 2014

Ref.    :         xxxxxx

M/s. xxxxxxxx  
P. O. Box: (NILL) xxxxxxx
Tel: xxxxxx Fax: xxxxx e-mail Add: xxxx

Attn.           :         Project Manager  

Project        :         xxxxxxxxxxx

Location     :         Model Town

Subject       :         Completion Certificate for Sewerage Connection- Navy Gate
Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. (NILL) dated 30th December, 2013 concerning the same, and in accordance to Your Company Name Team site inspection to the Sewer Connection works at Navey Gate – Model Town) Model Town Network (Manhole No. MHC 15 B) at Model Town Phase 1, Your Company Name  hereby do inform that the aforesaid sewer connection works were executed and completed as per the provided shop drawings and according to the endorsed Your Company Name Application Forms and Undertaking, incompliance with M/s. Model Town Management site rules and regulations. Furthermore, you will be fully responsible for the above connection in case of any leakage, blockage or damages might occur in future.

THIS NOC/CLEARANCE IS NOT CONSIDERED FOR DISCHARGING.

For discharging, you are required to fulfill and endorse (sign & stamp) the provided Application Form (Sewer Discharge Five Year Forecast) along with the soft copy of RSB – sewer effluent regulations & guide, and further submit the aforesaid application along with undertaking letter (sample attached) directly to M/s. Model Town for further permission for the same.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Eng. Kamal Khan
Landscape Manager
Encl: As Stated Above
Cc: M/s. Main Office
       Model Town Management
               

Thursday, 22 March 2018

Rectification of Fence at Service Corridor Sobi House


Date  :         Monday, 20th January, 2014

Ref.    :         xxxxxxxxx

M/s. xxxxxxxxxxxxxxxxx
P.O. Box: xxxxxxxxxxx
Tel xxxxxxxxxx Fax: xxxxxxxxxxxx / Mob: xxxxxxxxxx

Attn.           :         Project Manager

Project        :         xxxxxxxxxxxxxxxxxx

Location     :         Hattar Industiral

Subject       :         Rectification of Fence at Service Corridor Sobi House

Dear Sir,

Reference is made to the above mentioned subject and further to our repeated verbal/written instructions and warnings via attached Official letters issued as stated below table:

#
Ref. No.
Date
Remark
1
Kt/mt/dse814/048/T42
11th July, 2013

2
Kt/mt/dse814/0598/T42
16th May, 2013


Further to Your Company Name Team continuous site inspections, we have noticed that you are yet to take any required action regarding the temporary fence that was descend at site as shown attached photographs.

However, you have ignored our repeated instructions and written warnings. Therefore, under the authority provided to us by TMA Haripur; you are herby requested/required to immediately make all the necessary action to rectify the same.

In view of the above, we are hereby forward this issue to M/s. ZonesCorp Legal Department for further corrective action.

PLEASE CONSIDER THIS IS THE FINAL INSTRUCTION/WARNING

AJC HFM awaiting your rapid cooperation and URGENT action.

Thanks and best regards,
For Your Company Name


Mossa Khan
Facility Manager
Encl: As Stated Above
Cc: M/s. TMA Haripur



Completion Certificate for Sewerage Connection- Goll Mall


Date  :         Saturday, 04th January, 2014

Ref.    :         xxxxxxxxxx

M/s. xxxxxxxxx  
P. O. Box: xxxxxxxxxxxxxx
Tel: xxxxxxxxxxx Fax: xxxxxxxxxxxe-mail Add:xxxxxxxxxxxx

Attn.           :         Project Manager  

Project        :         xxxxxxxxxxxxx

Location     :         Gool Mall

Subject       :         Completion Certificate for Sewerage Connection- Goll Mall
Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. (NILL) dated 30th December, 2013 concerning the same, and in accordance to Your Company Name Team site inspection to the Sewer Connection works at Plot No. Gool Mall  Kareem Town (Manhole No. MHC 15 B) at Kareem Town Haripur, Your Company Name  hereby do inform that the aforesaid sewer connection works were executed and completed as per the provided shop drawings and according to the endorsed Your Company Name Application Forms and Undertaking, incompliance with M/s. Kareem Town site rules and regulations. Furthermore, you will be fully responsible for the above connection in case of any leakage, blockage or damages might occur in future.

THIS NOC/CLEARANCE IS NOT CONSIDERED FOR DISCHARGING.

For discharging, you are required to fulfill and endorse (sign & stamp) the provided Application Form (Sewer Discharge Five Year Forecast) along with the soft copy of RSB – sewer effluent regulations & guide, and further submit the aforesaid application along with undertaking letter (sample attached) directly to M/s. Kareem Town Engineering Dept for further permission for the same.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Mushtaq Awan
Area Incharge
Encl: As Stated Above
Cc: M/s. Kareem Town
                                                           

Completion Certificate for Access/Entrance – TMA House


Date  :         Thursday, 02nd January, 2014

Ref.    :         xxxxxxxxxxxxxxxxx

M/s. xxxxxxxxxxx  
P. O. Box: xxxxxxxxxxx
Tel: xxxxxxxx Fax: xxxxxxxxxx

Attn.           :         Project Manager  

Project        :         xxxxxxxxxxxxxxxxxxxxxxxx

Location     :         TMA

Subject       :         Completion Certificate for Access/Entrance – TMA House

Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. (NILL) dated 30th December, 2013 concerning the same,  and in accordance to Your Company Name Team site inspection to the TMA House (M/s. Awan Colony Haripur) at Haripur HAzara , Your Company Name hereby under the authority provided by Kareem Town do certify that your Access/Entrance to the TMA House and Service Corridor were executed and completed incompliance with M/s. Kareem Town site rules and regulations (Photos attached).

Furthermore, the Completion Certificate Application to your entire plot boundary and buildings must be applied to M/s. Kareem Town and the concerned authorities (TMA, Wapada, PESCO…etc) for their further approval and Certification.

Please do not hesitate to contact with Your Company Name Team Tel: xxxxxxxx for further clarifications/details.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Eng. Mussa Khan
Facility Manager
Encl: As Stated Above
Cc: M/s. TMA House
                                                               




Permit for Temporary Access, Temporary Fence And Installation of Project Signboard For Hina Shaheen House


Date  :         April 27, 2015


Ref.    :         xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx


M/s. xxxxxxxxxxxxxx
P.O. Box: xxxxxxxxxxxxxxx
Tel xxxxxxxxxxxxxxx Fax: xxxxxxxxx

Attn.           :         General Manager

Project        :         xxxxxxxxxxxxxxx

Location     :         Kareem Town

Subject       :         Permit for Temporary Access, Temporary Fence
And Installation of Project Signboard
For Hina Shaheen House

Dear Sir,

Reference is made to the above mentioned subject, and further to your letter Ref. No.  
2015/004/ رع
dated 24th April 2015 received 25th April 2015, along with M/s. Kareem Town Clearance via attached letter Ref. No. XS/222/15 dated 23rd April 2015 concerning the same, Your Company Name has no objection to proceed with your site activities, Temporary Access/Entrance at site according to the attached drawing Ref. No. DSS-114 and for your Temporary Fence works, posts to be erected within the plot boundary except the front side of the road is allowed to be erected 2.0mtr (Maximum) distance away from the plot and for your Project Signboard, please find attached drawing Ref. No. CDSS-113 depicting the specifications and details for the same in compliance with M/s. Kareem Town site rules and regulations on a condition based to maintaining and protecting the existing utility services and further to reinstate the site as previous status once you finished/completed your works and we recommend to use/apply the permanent road Access/Entrance for the same.

Please note that you CANNOT USE any equipment/mechanical excavation over service corridor, and further you are fully responsible for the aforesaid activities in case of any damages might occur to M/s. Kareem Town assets and all works will be under Your Company Name supervision

This NOC/Clearance is temporary to be applied upon completion of the above to enable you to proceed with internal activities inside Plot and Your Company Name has the authority to cancel/withdraw the permit once we notify any violation at Site.

Prior site commencement of works, you are required to coordinate with Your Company Name Team Tel: dddddddddddddddddd for further details/clarifications and assistance.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name

Eng. Mona MUnair
Encl: As Stated Above
Cc: M/s. Kareem Town Management
                Main Office


Permit for Shifting Of Existing Street Light Pole For Sela Bela House


Date  :         February 23, 2015

Ref.    :         xxxxxxxxxxxxxxxxxxx

M/s. xxxxxxxxxxxxx  
P. O. Box. xxxxxxxxxxxxxxxxxxx
Tel: xxxxxxxxxxx, Fax: xxxxxxxxx

Attn.           :         Mr. Khaled Khan - Project Manager

Project        :         xxxxxxxxxxxxx

Location     :         Sela Bela

Subject       :         Permit for Shifting Of Existing Street Light Pole
                             For Sela Bela House

Dear Sir,

Reference is made to the above mentioned subject and to letter Ref #; REF/14/024 along with Tenant Access Application form and further to M/s. Kareem Town advice via attached e-mail; we would like to inform you that we have No Objection for shifting of the existing street light pole for only Eight (08) meters from the original location in compliance with M/s. Kareem Town rules and regulation

Please not that you are fully responsible for the aforementioned works and all the expenses accordingly and all the works shall be under our supervision along with Wapada shut down permit and all related permits.

For any further details/clarifications, please do not hesitate to contact with Your Company Name,
Tel: xxxxxxxxxxxxxxxx

This is forwarded for your consideration and immediate action.

Thanking you,
For Your Company Name



Eng. Mehmood Khan
Area Manager
Encl: As Stated Above
Cc:           Kareem Town Management
                Main Office


Permit for Sewer Network Connection Sela Bela


Date  :         27th May, 2013

Ref.    :         xxxxxxxxxxxxxxxxxxxxxx

M/s. xxxxxxxxxxxxx
P.O. Box: xxxxxxxxxxxx
Tel xxxxxxxxxxx  Fax: xxxxxxxxxxxxxx

Attn.           :         Mr. xxxxxxxxxxxx – General Manager  

Project        :         xxxxxxxxxxxxxxxxxxxxxx

Location     :         Sela Bela

Subject       :         Permit for Sewer Network Connection Sela Bela

Dear Sir,

Reference is made to the above mentioned subject and further to your letter Ref. No. AS-COM-2013-042-AS received 25th May, 2013 along with required  drawings and the signed Applications concerning the same, please be informed that Your company name have reviewed your submitted drawings along with Applications, and Your company name have no objection to proceed with your works at site according to the submitted drawings and ADSSC standards incompliance with M/s. Kareem Town rules and regulations. Please find attached drawing (Ref. No. CSSC/BD-04) depicting the typical connection details for your easy reference.

However, you CANNOT DISCHARGE to the system till you get final approval from M/s. Kareem Town Management and all your excavation works shall be manual excavation (only manual excavations allowed at service Corridor)

Please find attached herewith the RSB -Tenant Discharge Control Rules (CD-Soft copy) for your review, respect, obey and follow the RSB sewer rules and trade effluent control regulations as provided by M/s. Kareem Town for safe and efficient sewerage/waste water services to Kareem Town Tenants/customers and to the satisfaction of M/s. Kareem Town.

Note: Commencement and completion of your sewer connection works must be within two (2) months from the date of issuance this approval and a set of As Built drawing (Hard + Soft copies) to be provided to Your company name upon completion and certification request for Clearance.

In addition to the above, you are required to coordinate with Your company name Team
(phone / mobile number) for further clarifications/details prior proceed your activities.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Eng. Toti Nara
Team Leader
Encl: As Stated Above
Cc:  M/s. Kareem Town
       Main Office                                                     

Permit for Sewer Network Connection Internal Backdrop/Drainage System M/s. Kashif Ali House



Date  :         January 18, 2015

Ref.    :         xxxxxxxxxxxxxxxxx

M/s. xxxxxxxxxxxxxx
P.O. xxxxxxxxxxxxx
Tel:    xxxxxxxxxxxxxx
Fax:   xxxxxxxxxxxx
Email: xxxxxxxxxxxxxxxxxxxxxxx@gmail.ae 

Attn.           :         Mr. Suleman Tuena – Managing Director  

Project        :         XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

Location     :         Kareem Town

Subject       :         Permit for Sewer Network Connection
                             Internal Backdrop/Drainage System
                             M/s. Kashif Ali House
                              
Dear Sir,

Reference is made to the above mentioned subject and further to your request via letter Ref. No. CC/761/2014 dated 15th January, 2015 received 15th January, 2015 and M/s. Kareem Town letter ref #; KT/07/013/15 dated 11th January 2015, please be informed that Your company name have reviewed your submittal and based on discussion held with M/s. Kareem TOWN, we have No Objection to proceed with your Internal Backdrop/Drainage System according to attached drawing (Provided Sketch).

However, you CANNOT DISCHARGE to the system till you get final approval from the Kareem Town Management and all your excavations to be executed manually (only Manual excavations allowed at service Corridor).

Note: Commencement and completion of your sewer connection works must be within two (2) months from the date of issuance this approval and a set of As Built drawing (Hard + Soft copies) to be provided to Your company name upon completion and certification request for Clearance.

In addition to the above, you are required to coordinate with (Your company name) Team
Tel: xxxxxxxxxxxxxx for further clarifications/details prior proceed your activities.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company name


Eng. Kamal pura
Area iNcha
Encl: As Stated Above                                                                                                           
Cc:  kareem Town
   Main Office



Permit/NOC for Soil Investigation Works (Kareem Town)


Date  :         04th September, 2012

Ref.    :         xxxxxxxx

M/s. xxxxxxxxx
P. O. Box: xxxxxxxxx
Tel.: xxxxxx, Fax: xxxxxxxxx

Attn.           :         Eng. Yousuf Khan – Director  

Project        :         xxxxxxxxxxxxxxx

Location     :         Kareem Town

Subject       :         Permit/NOC for Soil Investigation Works (Kareem Town)

Dear Sir,

Reference is made to the above mentioned subject and to your letter Ref. No. A|KTH.12.GL.315 dated 03rd September, 2012 along with required documents drawings concerning the same, please be informed that Your Company Name have no objection to proceed with your soil test/investigation works at site upon your submitted Undertaking Letter Ref. No. DSS.12.GL.315 dated 03rd September, 2012 incompliance with M/s. kareem Town rules and regulations and based on the following conditions.

  1. You are fully responsible for the aforesaid works in case of any damages might be happened/occurred to any of the existing services and to the M/s. kareem Town Assets. 
  2. Reinstate the site/service corridor to its original/previous status once you have finish site works.
  3. Your Company Name will visit the site once you have finished aforesaid works and to do the necessary inspections to ensure that the work is completed to the satisfaction of M/s. kareem Town and incompliance with site rule and regulations.

Prior site commencement of works, you are required to coordinate with Your Company Name Team (Tel: xxxx/Hotline: xxxxx) for further clarifications/details and assistance.

This is forwarded for your consideration and further action.

Thanks and best regards,
For Your Company Name


Kamal Khan
DC Client
Encl: As Stated Above
Cc:           M/s. Kareem Town
                TMA Haripur