Dear Sir,
With reference
to the above mentioned subject and further to your letter Ref: No. DSSSS032/B/LNM/2015/114
dated 14th April, 2015 received 16th April, 2015 along with TMA
approval letter ref: no. RRFF/11/200/15 dated 14th April, 2015 addressed to M/s.
Wapada and along with signed applications forms; in which you are requesting
permit for laying of
HV cables at Kareen Town at Haripur City.
HV cables at Kareen Town at Haripur City.
Please be
informed that, your submittal have been checked & reviewed by us and we
have
No Objection to proceed with the aforesaid site activities at Kareen Town at Haripur City., as per the following conditions in compliance with M/s. Wapada rules and regulation.
No Objection to proceed with the aforesaid site activities at Kareen Town at Haripur City., as per the following conditions in compliance with M/s. Wapada rules and regulation.
1)
You are fully responsible
for the aforementioned works in case of any damages that might occur to the
existing underground services during your Manual Excavation works and site
situation to be reinstated to its original status.
v
Please see the attached drawing
ref #; KK/TT/45/47
for the existing underground services.
for the existing underground services.
2)
Trial pits to be executed
in presence of your company name to investigate the underground utilities prior
any site works commencement (Set of as Built attached for reference only).
3)
All your excavation to be executed
manually only under Your
Company Name control.
4)
You are requested to
coordinate with Your Company Name Team in order to advice in regards to
the trial pits 1.5m depth of each 15m to be done along the proposed trench
route. Trial pits must be investigated by
Your Company Name Team and all the site safety measures to be applied.
5)
All of the above is
subjected to UNION GAS Permit approval which must be obtained in the Vicinity
of the Gas Pipe and presented to AJC HFM prior site operations.
6)
Set of (As Built) is to be
provided (Hard & Soft copies) upon completion of works and issuance of
Completion Certificate.
7)
The above permit is
withdrawn once the site condition is not clear based on your company name
recommendation.
8)
Completion Certificate
issuance is mandatory requirement upon completion, in order to allow M/s. Wapada
to clear your site works, and advise your Client with the same.
For any further
details/clarifications, please do not hesitate to contact with Your company
name Team -Tel: xxxxxxxxxxxxxxxxxxxxxx/xxxxxxxxxxxxxxx
This is forwarded for your consideration and immediate action.
Thanking you,
For
Your Company Name
Eng. Isarass Shah
Client Manager
Encl:
As Stated Above
Cc:
M/s. Wapada Haripur
Main Office
No comments:
Post a Comment
thanks for your time, if you have any Question, write to us, we will contact you soon. Regards